SpaceX Starship page

FAQ

  1. When next launch? (Flight 8) SpaceX have applied for the FCC (not FAA) license, launch NET Feb 24th. (Starship Gazer, FCC)
  2. When previous launch? (Flight 7)? Booster 14 and Ship 33 launched on 2025-01-16.
  3. What was the result? Booster lands on chopsticks, ship experiences an RUD shortly before SECO.

Quick Links

Nerdle Cam | Lab Cam | Sapphire Cam | Sentinel Cam | Rover Cam | Rover 2.0 Cam | Rocket Ranch Cam | Plex Cam | NSF Starbase Live

Starship Dev January | Starship Dev December | Starship Dev November | IFT-6 launch thread | Starship Dev October | IFT-5 launch thread

Official SpaceX Starship Update Video (2024-04-06)


Road closures and road delays

Cameron County website - @bocaroad Mastodon bot

*As of 2025-02-02

  • 2-hour road delay is posted for Feb 4th from 00:00 to 04:00 for transportation from factory to Massey's. Potential candidates are S34 static fire, Test Tank 16 cryo test, or B16 cryo test.
  • 1-hour road delay is posted for Feb 8th from 00:00 to 06:00 for transportation from factory to launch pad. B15 rollout for static fire seems likely.
  • 12-hour road closures are posted for Feb 9th, 10th, and 11th from 07:00 to 19:00 for non-flight testing activities.
  • 2-hour road delay is posted for Feb 9th from 00:00 to 04:00 for transportation from Massey's to factory.
  • 2-hour road delay is posted for Feb 10th from 00:00 to 04:00, 06:00 to 10:00, 12:00 to 16:00, 21:00 to 00:00, for transportation from factory to Massey's.
  • 12-hour road closures for Feb 10th and 11th are revoked.
  • 2-hour road delays are posted for Feb 12th and 13th, 00:00 to 04:00 for transport from Brownsville Port to Pad.
  • 2-hour road delay is posted for Feb 12th, 00:00 to 04:00 or 18:00 to 22:00 for transport from Massey's to factory.
  • 2-hour road delays are posted for Feb 13th and 14th, 00:00 to 04:00 for transport from Brownsville Port to Pad.
  • 2-hour road delay is posted for Feb 12th, 20:00 to 00:00 for transport from Massey's to factory.
  • 2-hour road delays are posted for Feb 13th and 14th, 00:00 to 04:00 for transport from Brownsville Port to Pad.

Vehicle Status

*As of 2025-02-10

Follow Ring Watchers on Twitter and Discord for more.

Ship Location Status Comment
SN2 Rocket Garden Pending scrapping?
S20 Rocket Garden Pending scrapping?
S31 Indian Ocean Successful splashdown Cryo tested May 12th, suffers small electrical fire. Underwent repairs in the Highbay, rolls back to Massey's Jul 1. Cryo tested Jul 2nd and 3rd. Engines installed by Jul 26th. Rolls to Massey's Sep 6th. Partial (aborted) cryo test Sep 8th. Static fired Sep 18th. Preflight checkouts completed Nov 17th. Launched as IFT-6 on Nov 19th. In-space raptor relight was successful, ship survived reentry and performed soft splashdown in the Indian Ocean.
S32 Highbay Scrapped Fully stacked, fore flaps installed but not aft flaps. Scrapping began early Feb, ended mid Feb.
Test Tank 16 Massey's Testing Cryo tested four times between July and September. Sliding plates added to the catch points on Jan 27th.
S33 Caribbean Destroyed First V2 Starship. Nosecone spotted Jul 14th. Forward section spotted Jul 27th. Stacking completed Aug 23. Cryo tested Oct 29th (partial), 30th (full), and 31st (full). Raptor installation begins Nov 9th. Spin prime Dec 12th. Static fired Dec 15th and 16th. Starlink simulators loaded Jan 7th. Catch hardware installed Jan 8th. Wet dress rehearsal performed Jan 10th. Launched Jan 16th, experienced an RUD shortly before SECO.
S34 Megabay 2 Pending FTS install Methane header tank spotted Aug 14th. Nosecone stacked on payload bay Sep 20th. Stacking completed around end of November. Cryo tested Jan 17th. Static fired Feb 11th.
S35 Megabay 2 Pending flap install Parts spotted Sep 20th. Forward flap installation Dec 3rd. Nosecone stacked on payload bay Dec 11th. Stacked by Feb 7th.
S36 Megabay 2 Stacking Parts spotted in December. Moved to Megabay 2 Feb 12th.
S37 Starfactory Nose cone tiling Parts spotted in December.
S38 Starfactory Assembly Parts spotted in December.
Booster Location Status Comment
B12 Megabay 1 Post-flight inspection Cryo x2, Static fire Jul 15th. Full stack cryo tests Sep 23rd and Oct 7th. FTS installed Oct 9th. Launched as IFT-5 on Oct 13, returned to launch site for successful chopstick catch. Moved to Megabay 1 Oct 15th.
B13 Gulf of Mexico Successful splashdown Cryo tests Apr 26th (methane tank) and Apr 29th (LOX tank). Static fired Oct 24th. Preflight checkouts completed Nov 17th. Launched as IFT-6 on Nov 19th. Chopsticks catch attempt was aborted, performed soft splashdown in the Gulf.
B14 Megabay 1 Pending inspections Stacked Apr 26th, Cryo tested Oct 4th and 5th. Static fired Dec 9th. FTS installed Jan 3rd. Wet dress rehearsal performed Jan 10th. Launched and landed Jan 16th.
B14.1 Megabay 1 Scrapping Multiple catch simulation "slap tests" performed on Jun 26th and 27th. Scrapping started Jan 12th.
B15 Megabay 1 Pending hot staging adapter install Stacked from July to September. Methane tank cryo test Dec 27th, full cryo test Dec 28th. Static fired Feb 9th.
B16 Megabay 1 Pending cryo test Stacking completed by Dec 26th.
B17 Build Site Assembly Parts spotted. First two sections moved to Megabay 1 Jan 4th.

Resources

top 21 comments
sorted by: hot top controversial new old

Starbase activities (2025-02-21):

  • Launch site: Feb 20th cryo delivery tally.
  • NSF post a timelapse of chopsticks activity. (NSF)
  • Another vertical tank is delivered to the tank farm. (ViX)
  • Another pump is installed at the tank farm. (ViX)
  • The yellow LR11000 crane moves away from the launch towers. (ViX)
  • Build site: B15's hotstage ring moves from Megabay 1 back to Starfactory. (ViX)
  • 2-hour road delays are posted for Feb 21st and 22nd from 00:00 to 04:00 for transport from Brownsville Port to pad.

Flight 8:

  • Road closures are posted for Feb 26th, 27th, and 28th from 10:30 to 23:30 for flight testing activities. Feb 26th closure is scheduled.
  • Mexican NOTAM is posted. (ViX)
  • Australian NOTAM is posted. (VIX)

Flight 9:

  • FCC document includes the option of the Ship returning to the launch site. (NSF, FAA)

Other:

Starbase activities (2025-02-20):

  • Launch site: Overnight, another tank is delivered. (ViX 1, ViX 2)
  • In the late morning, the lifted into position. (ViX)
  • The Pad A chopsticks are raised to max height and opened wide. This usually precedes Booster rollout, but no road closures have yet been scheduled. (NSF, ViX)
  • Build site: The hot stage adapter stand, now empty, moves from Megabay 1 to Starfactory. (ViX)
  • S32 scrapping continues. (ViX)

Flight 8:

Starbase activities (2025-02-19):

  • 2-hour road delay is posted for Feb 21st, 00:00 to 04:00 for transport from Brownsville Port to pad.
  • Another S32 section is moved to the scrap yard. (ViX)
  • S35 is being retro-fitted with doubler plates over the catch points. (ViX 1, ViX 2)
  • A hotstage adapter, presumably for B15, moves from Starfactory towards Megabay 1. (NSF, ViX)
  • A pink crane is delivered to the launch site. (ViX)

KSC:

  • The barge loaded with seven cryo tanks departs the turn basin. (NSF)

Starbase activities (2025-02-18):

  • Feb 17th addendum: Pad B chopsticks timelapse. (ViX)
  • The first of the new pumps is installed at the tank farm. (ViX)
  • S36 forward section moves from Starfactory to Megabay 2. (ViX)
  • S32 sections are moved to the scrap yard. (ViX)
  • 2-hour road delay is posted for Feb 20th, 00:00 to 04:00 for transport from Brownsville Port to pad.

KSC:

  • All seven cryo tanks are loaded on the barge. (ViX, Priel)

Starbase activities (2025-02-17):

KSC:

Starbase activities (2025-02-16):

  • Pretty quiet Sunday.
  • A coyote is sighted near the tank farm. (ViX)
  • NSF post video of recent chopstick actuator installation at Pad B. (NSF)

KSC:

  • The number of cryo tanks at the KSC turn basin has risen to six. (LabPadre)

Starbase activities (2025-02-15):

  • Feb 14th cryo delivery tally.
  • Star factory video tour. A few new pieces of hardware are visible. (ViX)
  • Another section (F3:3) of B17's methane tank moves from Starfactory to Megabay 1. (ViX)

KSC:

[–] threelonmusketeers@sh.itjust.works 5 points 2 weeks ago* (last edited 2 weeks ago)

Starbase activities (2025-02-01):

Starbase activities (2025-02-14):

  • Feb 13th cryo delivery tally.
  • Feb 13 addendum: Chopsticks movement timelapse. (ViX)
  • Launch site: The second vertical methane tank is erected at the tank farm. (ViX)
  • Concrete forms to extend the blast wall which protects the tank farm are installed. (Anderson)
  • Build site: A welding robot moves from the Highbay to Starfactory. (ViX)
  • Other: TCEQ approves the water deluge permit after thorough analysis and finding of no significant impact. (TCEQ, Anderson)
  • SpaceX propose to build a roundabout at the end of Highway 4. (Anderson)

Starbase activities (2025-02-04):

Starbase activities (2025-02-02):

  • Feb 1st cryo delivery tally.
  • Build site: Starkitty is sighted. (ViX)
  • An aft flap moves from Starfactory to Megabay 2, likely the second flap for S34. (ViX, NSF)
  • Launch site: Some flame damage is visible on the Tower A cladding. (Gisler 1, Gisler 2)
  • Some cabling from the Drawworks platform is threaded through the hole roof of the Tower B base. (ViX, Anderson 1, Anderson 2)
  • Excavation for installation of piping/conduit is underway alongside Highway 4. (ViX)

Starbase activities (2025-02-03):

Starbase activities (2025-02-05):

  • Feb 4th cryo delivery tally.
  • Launch site: Water is delivered to top up the deluge system. (ViX)
  • Two large ducted fans are arrive, one of which is offloaded. These are likely for the dissipation of gaseous N2. (Golden, ViX)
  • Pad A: Booster quick disconnect performs a nitrogen purge for the first time since Flight 7. (Tyler Gray (now on BlueSky!))
  • Pad B: RGV Aerial post another recent flyover photo of the flame trench construction.
  • Build site: Pez dispenser loading mechanism moves from Highbay to Starfactory. (ViX)
  • Massey's: Cranes are observed operating near Test Tank 16. (ViX)
  • RGV Aerial post a labeled diagram of Massey's as of Feb 2nd.
[–] threelonmusketeers@sh.itjust.works 4 points 2 weeks ago* (last edited 2 weeks ago)

Starbase activities (2025-02-07):

[–] threelonmusketeers@sh.itjust.works 4 points 1 week ago* (last edited 1 week ago)

Starbase activities (2025-02-08):

Starbase activities (2025-02-10):

  • Launch site: B15 is transferred from the launch mount to the transport stand. (NSF, ViX 1, ViX 2)
  • Build site: S34 is transferred to the static fire stand and transported to Massey's. (NSF, ViX, Starship Gazer 1, Starship Gazer 2)
  • S32 scrapping continues. (ViX)
  • B15 moves from the launch site to Megabay 1. (NSF, Tyler Gray, LabPadre, ViX 1, ViX 2)
  • 12-hour road closures for Feb 10th and 11th are revoked.
  • 2-hour road delays are posted for Feb 12th and 13th, 00:00 to 04:00 for transport from Brownsville Port to Pad.

Florida activities:

  • Comparison of synthetic aperture radar images of LC-39A between Jan 26th and Feb 10th. (Harry Stranger)
  • Pile driver working near the launch tower. (Kai Blaschke)

Starbase activities (2025-02-13):

Starbase activities (2025-02-12):

  • Feb 11th cryo delivery tally.
  • Feb 11th addendum: Additional video and info of S34's static fire. (SpaceX 1, SpaceX 2, Interstellar Gateway)
  • Launch site: Another tank is delivered to the launch site and erected by the black LR11000 crane. (ViX 1, ViX 2)
  • Mystery "ruhRPumpen" is delivered. (Gisler)
  • Trench digging continues. (ViX)
  • The second chopstick actuator is installed by the yellow LR11000 crane at Pad B. (ViX, Anderson 1, Anderson 2)
  • Build site: S32 scrapping continues. (cnunez)
  • S36 emerges from Starfactory. Catch hardware is visible. (LabPadre, ViX)
  • Work on launch mount B continues. (cnunez, RGV Aerial)
  • Massey's: S34's flaps are folded and secured. (ViX 1, ViX 2)
  • 2-hour road delay is posted for Feb 12th, 20:00 to 00:00 for transport from Massey's to factory.
  • 2-hour road delays are posted for Feb 13th and 14th, 00:00 to 04:00 for transport from Brownsville Port to Pad.

Starbase activities (2025-02-11):

Starbase activities (2025-02-09):

Starbase activities (2025-02-06):